access deny [1420]
 
YEAR TITLE
2023 A Three-Stage Optimization Model for Scheduling the Facilities Maintenance Considering Random Failure Rate
F Zagia, O Motamedi Sedeh, B Ostadi
Scientia Iranica 30 (5), 1898-1909
2023 A risk-return based mathematical model for resource allocation with considering the process resilience and continuity
M Ebrahimi-Sadrabadi, B Ostadi, A Husseinzadeh Kashan, MM Sepehri
Scientia Iranica
2023 Inpatient bed management considering collaboration strategy to enhance hospital resilience.
M Pishnamazzadeh, MM Sepehri, B Ostadi
Journal of Industrial and Systems Engineering
2023 An Integrated Approach Based on MADM and MODM for Order Picking System Considering Human Factors
F Nikkhoo, AH Kashan, B Ostadi, E Nikbakhsh
International Journal of Information Technology & Decision Making
2023 A New Scenario-Based Simulation Model for Cost Management of Healthcare Services through Improving the Efficiency of the Health Centers
B Ostadi, R Mokhtarian Daloie, MM Sepehri
Journal of Healthcare Engineering 2023
2023 Effective league championship algorithm and lower bound procedure for scheduling a single batch-processing machine with non-identical job sizes and job rejection
S Afkhami, AH Kashan, B Ostadi
RAIRO-Operations Research 57 (3), 1453-1479
2023 Analysis of Iran?s civil aviation accidents and serious? incidents from 1979 to 2021 using failure mode and? effects analysis and multi-attribute decision making? methods
A Nosrati Malekjahan, A Husseinzadeh Kashan, B Ostadi
Journal of Aeronautical Engineering 25 (1), 154-180
2023 A novel model based on Extended Monte Carlo simulation for investigating the effect of co-occurrence of risks considering utility function
S Abbasi Harofteh, B Ostadi
Journal of Industrial and Systems Engineering
2023 A systematic literature review of organization resilience, business continuity, and risk: Towards process resilience and continuity
B Ostadi, M Ebrahimi-Sadrabadi, MM Sepehri, A Husseinzadeh Kashan
Iranian Journal of Management Studies 16 (1), 229-257
2022 Application of a hybrid model based on multiple linear regression-principle component analysis (MLR-PCA) for electricity export forecasting
M Doroodi, MR Amin-Naseri, B Ostadi
Scientia Iranica
2022 Optimization Model for Maintenance Planning of Loading Equipment in Open Pit Mines
F Javadnejad, MR Sharifi, MH Basiri, B Ostadi
European Journal of Engineering and Technology Research 7 (5), 94-101
2022 A novel optimization model for biding in the deregulated power market with pay as a bid settlement mechanism, based on the stochastic market clearing price
O Motamedisedeh, B Ostadi, F Zagia, AH Kashan
Electric Power Systems Research 210, 108122
2022 Linguistic Z-number Muirhead mean operators and their applications in ethical-financial portfolio selection
AH Mahmoodi, SJ Sadjadi, S Sadi-Nezhad, R Soltani, ...
Scientia Iranica 29 (3), 1592-1621
2022 A novel risk assessment approach using Monte Carlo simulation based on co-occurrence of risk factors: A case study of a petrochemical plant construction
B Ostadi, S Abbasi Harofteh
Scientia Iranica 29 (3), 1755-1765
2022 Activity-based costing in the public sector and non-profit organisations: towards risk-based approach
B Ostadi, R Zare
International Journal of Productivity and Quality Management 35 (1), 1-16
2021 A multi-objective model for resource allocation in disaster situations to enhance the organizational resilience and maximize the value of business continuity with considering ?
B Ostadi, MM Seifi, A Husseinzadeh Kashan
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of ?
2021 Appointment process of open-heart surgery in Shahid Rajaei Heart Hospital using a discrete event simulation approach
B Rahmani Manshadi, B Ostadi, A Jalali
Journal of Hospital 20 (2), 1-18
2021 A two-stage reliability optimization approach for solving series?parallel redundancy allocation problem considering the sale of worn-out parts
B Ostadi, R Hamedankhah
Annals of Operations Research 304 (1-2), 381-396
2021 A novel hybrid GA-PSO optimization technique for multi-location facility maintenance scheduling problem
OM Sedeh, B Ostadi, F Zagia
Journal of Building Engineering 40, 102348
2021 A Three-Stage Optimization Model for Scheduling the Facilities Maintenance Considering Random Failure Rate
F Zagia, O Motamedi Sedeh, B Ostadi
Scientia Iranica
2021 A hybrid approach for joint optimization of base and extended warranty decisions considering out-of-warranty products
M Afsahi, AH Kashan, B Ostadi
Applied Mathematical Modelling 95, 176-199
2021 Presenting a model for the optimal allocation of human resources to operational processes using the Markowitz model: A case study in urology unit at a kidney center
B Ostadi, M Ebrahimi-Sadrabadi, A Husseinzadeh Kashan, ...
Journal of Quality Engineering and Management 11 (1), 77-87
2021 A bi-objective simulation-based optimization approach for optimizing price, warranty, and spare part production decisions under imperfect repair
M Afsahi, AH Kashan, B Ostadi
International Journal of Information Technology & Decision Making 20 (03 ?
2021 Identification and Prioritization of performance evaluation indicators of knowledge-based companies
B Ostadi, M Sadri
Journal of Innovation and Value Creation 18 (18), 69
2021 Provide a pattern for choosing a discount-based pricing strategy in marketing (Case Study in a Chain Store)
A Abdollahi, B Ostadi
Commercial Strategies 17 (16), 198-185
2021 Process capability studies in an automated flexible assembly process: A case study in an automotive industry
B Ostadi, M Taghizadeh Yazdi, A Mohammadi Balani
Iranian Journal of Management Studies 14 (1), 1-37
2020 Evaluating the Efficiency of petrochemical companies based on human resource, operations and sales functions using Data Envelopment Analysis (DEA) approach
B Ostadi, M Zarinkolah
Journal of Quality Engineering and Management 10 (3), 259-267
2020 Introducing a New Mathematical Formula for Calculating Customer Perceived Value Using the? Taguchi Loss Function and Customer Lifetime Value
B Ostadi, A Abdollahi
New Marketing Research Journal 10 (3), 105-118
2020 Evaluating and prioritizing the failure factors and cause of delays in IT projects using FMEA: Towards project continuity
P Gharibnejad, B Ostadi
Journal of Industrial and Systems Engineering 13 (1)
2020 Optimization of bidding strategy in the day-ahead market by consideration of seasonality trend of the market spot price
OM Sedeh, B Ostadi
Energy Policy 145, 111740
2020 A quantitative target-setting model using Monte Carlo simulation method: mapping in strategic management and balanced scorecard (BSC) context
B Ostadi, Z Honarmand Shahzileh, A Gerami
Journal of Statistical Computation and Simulation 90 (13), 2421-2437
2020 An assessment model for hospital resilience according to the simultaneous consideration of key performance indicators: A system dynamics approach
M Pishnamazzadeh, MM Sepehri, B Ostadi
Perioperative Care and Operating Room Management 20, 100118
2020 A method to calculate the acceptance probability and risk of rejection of bid prices on the electricity market
B Ostadi, S Ghaffari, MA Rastegar
Iranian Electric Industry Journal of Quality and Productivity 9 (2), 55-59
2020 Optimizing decisions on under-and out-of-warranty products in a finite planning horizon
M Afsahi, A Husseinzadeh Kashan, B Ostadi
Scientia Iranica 27 (1), 494-515
2020 Risk-based optimal bidding patterns in the deregulated power market using extended Markowitz model
B Ostadi, OM Sedeh, AH Kashan
Energy 191, 116516
2020 Identification and prioritisation the critical activities of the emergency department using business continuity management concept
B Ostadi, M Alibakhshi, MM Sepehri
International Journal of Business Excellence 22 (1), 98-113
2020 Reliability and risk assessment of electric cable shovel at Chadormalu iron ore mine in Iran
MH Basiri, MR Sharifi, B Ostadi
International Journal of Engineering 33 (1), 170-177
2019 An intelligent model for predicting the day-ahead deregulated market clearing price: A hybrid NN-PSO-GA approach
B Ostadi, O Motamedi Sedeh, A Husseinzadeh Kashan, MR Amin-Naseri
Scientia Iranica 26 (6), 3846-3856
2019 Developing a Discrete-Eevent Simulation Model for Improving the Quality of Services: A Case Study in Urology Unit at a Kidney Center
R Mokhtarian Daloi, B Ostadi
Journal of Quality Engineering and Management 9 (3), 244-260
2019 Presentation of mathematical formula in Employee Value
N Soleimani, M Aghdasi, B Ostadi
Modern Research in Decision Making 4 (1), 101-118
2019 Prioritizing the Critical Success Factors of Supply Chain Quality Management Based on Weighting Indicators Using Analytical Hierarchy Process: A Case Study in Golbaft Bag ?
B Ostadi, A Pourqader Choobar, R Mokhtarian Deloui
Journal of Quality Engineering and Management 9 (1), 11-26
2019 Introduce a New Simulation-Based Optimization Model to Integrate Decisions about Products under Warranty and Out of Warranty
M Afsahi, A Hosseinzadeh Kashan, B Ostadi
Journal of Quality Engineering and Management 8 (4), 310-326
2019 A?S?S?E?S?S?I?N?G T?H?E M?A?T?U?R?I?T?Y O?F S?U?P?P?L?Y C?H?A?I?N P?R?O?C?E?S?S?E?S B?Y U?S?I?N?G C?O?M?B?I?N?E?D A?P?P?R?O?A?C?H?E?S S?C?O?R A?N?D B?P?O B?A?S?E?D O?N T?E?C?H?N?I?Q?U?E?S F?A?H?P A?N?D G?R?A
B Ostadi, S Etezadi, S Khalili E?s?b?o?u?e?i
Sharif Journal of Industrial Engineering & Management 34 (2.1), 45-51
2019 Developing a Model for Dynamic Schedule of Heart Surgery based on Patients Maximum Delay
I Dehghan, B Ostadi, S Hosseini
Journal of Hospital 17 (4), 57-65
2019 Modelling the estimation of the optimum number of required equipment and manpower for operational processes under uncertainty conditions (case study: Textile industry)
B Ostadi, A Ghorbani, R Mokhtarian
Advances in Industrial Engineering 53 (1), 509-521
2019 ASSESSING THE MATURITY OF SUPPLY CHAIN PROCESSES BY USING COMBINED APPROACHES SCOR AND BPO BASED ON TECHNIQUES FAHP AND GRA
B OSTADI
INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING) 341 (21), 45-51
2019 Application of FEMA and RPN techniques for man-machine analysis in Tobacco Company
B Ostadi, MS Masouleh
Cogent Engineering 6 (1), 1640101
2019 A developed method for Handling uncertainty in activity-based costing for hospital services using fuzzy approach.
B Ostadi, RM Daloie, MM Sepehri
Hospital 17 (4), 19-34
2019 A combined modelling of fuzzy logic and Time-Driven Activity-based Costing (TDABC) for hospital services costing under uncertainty
B Ostadi, RM Daloie, MM Sepehri
Journal of biomedical informatics 89, 11-28
2018 Revenue Management Under Variable Resource Capacity Requirements and Importance Factor for Patient Classes in Hospitals
A Husseinzadeh Kashan, A Rahmani, B Ostadi
Journal of Modeling in Engineering 16 (54), 257-265
2018 Prediction Model for Irans Electricity Market Clearing Pricees: Improved SVM Algorithm
O Motamedi, B Ostadi, A Husseinzadeh Kashan
Journal of Energy Planning And Policy Research 4 (2), 7-34
2018 Dynamic Pricing and warranty Length optimization in product?s life cycle (A Case study in SANAM Electronic Company)
M Afsahi, A Hosseinzadeh Kashan, B Ostadi, H Zegordi
Modern Research in Decision Making 3 (2), 27-53
2018 An optimal preventive maintenance model to enhance availability and reliability of flexible manufacturing systems
B Ostadi
Journal of Industrial and Systems Engineering 11 (2), 47-61
2018 Estimated Cost Function of Energy Generation in Ardebil Combied Cycle Power Plant by Artificial Intelligence Algorithms
O Motamedi Sede, B Ostadi, A Hussein Zadeh Kashan, MR Amin Naseri
Iranian Energy Economics 7 (27), 135-175
2018 Integrated Price Optimization, Basic Warranty Policies and Warranty Renewal Taking into Account Products out of Warranty
M Afsahi, A Husseinzadeh Kashan, B Ostadi, SH Zegordi
Journal of Quality Engineering and Management 8 (1), 63-74
2018 Operational Risk Assessment Using Bayesian Inference with Regard to the Composition of Data Sources and the Assumption of Dependence between Experts and Internal Loss Data
B Ostadi, S Khazayi, A Husseinzadeh Kashan
Financial Management Strategy 6 (1), 53-72
2017 Evaluating the Relationship between Quadruple Concept of CLV and Triple Organization Values in Insurance Companies
N Soleimani, A Albadavi, M Aghdasi, B Ostadi
Journal of Business Management 9 (3), 527-550
2017 Investigating the relationship between productivity factors and performance of organizations by considering environmental indicators based on ISO 14001 standard
A Bahrami, B Ostadi
Journal of Quality Engineering and Management 7 (2), 140-158
2017 A practical self-assessment framework for evaluation of maintenance management system based on RAMS model and maintenance standards
B Ostadi, H Saifpanahi
Journal of Industrial and Systems Engineering 10 (1), 125-143
2016 The Relationship between Productivity Factors and Organizational Performance with Regards Financial and Economic Benefits Using ISO 10014 Guidelines
A Bahrami, B Ostadi, M Aghdasi
Advances in Industrial Engineering 50 (3), 381-391
2016 Recognition and study of influential improvement projects in promotion of organization Excellence privilege based on Iran police quality model (MAKNA)
B Ostadi, S Keivanifar, R Baradaran Kazemzadeh
Police Organizational Development 13 (57), 87-105
2016 Identifying improvement projects based on energy consumption management in hospital and prioritizing them using fuzzy analytic hierarchy process (FAHP)
B Ostadi, A Navidi
Journal of Hospital 15 (2), 23-40
2015 Grouping evolution strategies: An effective approach for grouping problems
AH Kashan, AA Akbari, B Ostadi
Applied Mathematical Modelling 39 (9), 2703-2720
2015 Developing a hybrid business process model based on simulation-knowledge management
A Ghorbanian, B Ostadi, K Chaharsooghi
Management and Administrative Sciences Review 4 (2), 306-324
2013 Learning organisations, strategic deployment and change management strategy for enhancing successful implementation of BPR projects
K Rrezaie, B Ostadi, H Samadi, M Mohammadi, S Nazari-Shirkouhi
International Journal of Business Innovation and Research 7 (1), 61-83
2012 Critical success factors: mapping and examining in process management context
K Rezaie, B Ostadi, S Tadayoun
International Journal of Productivity and Quality Management 10 (2), 164-206
2012 The impact of implementing total quality management on organisational structure
Z Aghasizadeh, M Aghdassi, B Ostadi
International Journal of Productivity and Quality Management 9 (4), 472-485
2011 An examination of the influences of desired organisational capabilities in the preparation stage of business process re-engineering projects
B Ostadi, M Aghdasi, A Alibabaei
International Journal of Production Research 49 (17), 5333-5354
2010 The impact of ISO/TS 16949 on automotive industries and created organizational capabilities from its implementation
B Ostadi, M Aghdasi, RB Kazemzadeh
Journal of industrial engineering and management 3 (3), 494-511
2010 A Fuzzy Multi Criteria Decision Making Model as a Means of Selecting a Risk Analysis Technique in Process Industry
M Aghdaghi, V Ebrahimipour
Advances in Industrial Engineering 44 (2), 105-116
2010 The Exploration of the Relationship and Interaction Between the Preparation Stage of BPR Projects and Quality Management Systems (QMSs) Using Concepts of RBVF Model and Dynamic ?
B Ostadi, M Aghdasi, A Albadvi, K Rezaie
Advances in Industrial Engineering 44 (2), 117-125
2010 Desired organisational capabilities (DOCs): mapping in BPR context
M Aghdasi, A Albadvi, B Ostadi
International Journal of Production Research 48 (7), 2029-2053
2009 Critical success factors (CSFs) for process management projects
K Rezaiea, B Ostadib, S Tadayoun, M Aghdasi
2009 16th International Conference on Industrial Engineering and Engineering ?
2009 The examination of the role of desired organizational capabilities (DOCs) in readiness for implementing of BPR
B Ostadia, M Aghdasi, A Albadvi, K Rezaie
2009 16th International Conference on Industrial Engineering and Engineering ?
2009 Safety interval analysis: A risk-based approach to specify low-risk quantities of uncertainties for contractor?s bid proposals
K Rezaie, A Gereie, B Ostadi, M Shakhseniaee
Computers & Industrial Engineering 56 (1), 152-156
2009 Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness
J Razmi, B Ostadi
JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ?
2008 Activity-based costing in flexible manufacturing systems with a case study in a forging industry
K Rezaie, B Ostadi, SA Torabi
International Journal of Production Research 46 (4), 1047-1069
2007 Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties
K Rezaie, MS Amalnik, A Gereie, B Ostadi, M Shakhseniaee
Applied Mathematics and Computation 190 (2), 1492-1501
2007 A non-linear programming model for optimization of the electrical energy consumption in typical factory
B Ostadi, D Moazzami, K Rezaie
Applied mathematics and computation 187 (2), 944-950
2007 A mathematical model for optimal and phased implementation of flexible manufacturing systems
K Rezaie, B Ostadi
Applied mathematics and computation 184 (2), 729-736
2006 A practical implementation of the process capability indices
K Rezaie, MR Taghizadeh, B Ostadi
Journal of Applied Sciences 6 (5), 1182-1185
2006 Applications of process capability and process performance indices
K Rezaie, B Ostadi, MR Taghizadeh
Journal of Applied Sciences 6 (5), 1186-1191
2006 A mathematical model for load Optimization: Linear Load Curves
SF Ghaderi, J Razmi, B Ostadi
Journal of Applied Sciences 6 (4), 883-887
2006 T have been proposed to provide practitioners a way to calculate
K Rezaie, MR Taghizadeh, B Ostadi
Journal of Applied Sciences 6 (5), 1182-1185
2006 Process Capability and Process Performance
K Rezaie, M Rabbani, MR Taghizadeh, B Ostadi
The 36th CIE Conference on Computers & Industrial Engineering, Conference ?
2006 Measuring Process Capability Indices
K Rezaie, B Osadi, MR Taghizadeh
Conference: The 36th International Conference on Computers & Industrial ?
2006 The Activity-based Costing Approach for Estimation of Part?s Cost in FMS with
K Rezaie, B Ostadi
 
2006 The activity-based costing approach for estimation of parts cost in FMS with F (2)-degree automation: a case study in a forging industry
K Rezaie, B Ostadi
Inf Technol J
2004 A Semi-dynamic Approach for Scheduling Cargo Trains
J Razmi, SF Ghaderi, B Ostadi
PROCEEDINGS OF INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING
2004 Scheduling of cargo trains with complex limitations by computer simulation
A Azadeh, H Izadbakhsh, B Ostadi
PROCEEDINGS OF INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING
2004 A multi-objective cargo train scheduling model: a mathematical approach
J Razmi, MS Amalnik, B Ostadi
International Journal of Management Practice 1 (4), 363
2001 Key success factors in implementing process management and providing framework for assessing organizational readiness
K Rezaei, S Tadayon, B Ostadi, M Aqdasi
Industrial Management Journal 1 (3), 37-52
  Introducing a New Mathematical Formula for Calculating Customer Perceived Value Using the
B Ostadi, A Abdollahi
 
  A Data-Driven Combination Approach of the K-Means Clustering and Genetics Algorithm for Credit Scoring of the Bank Customers Considering a Nonlinear Scoring Function
O Motamedi Sedeh, F Zagia, B Ostadi
Available at SSRN 4060665
  Optimizing under and out of warranty products? decisions in the finite planning horizon
M Afsahi, AH Kashan, B Ostadi
Sharif Univ. Technol
  Critical Success Factors of BPM implementation and present a framework for evaluating of organization readiness
K Rezaee, S Tadayon, B Ostadi, M Aghdasi
industrial management journal 1 (3), 37-52
  Maintenance Management in Flexible Manufacturing Systems: A Case Study in a Painting Robot
K Rezaie, B Ostadi, MR Taghizadeh
 
  Description of Process Capability Indices
K Rezaie, B Ostadi, MR Taghizadeh, M Sadeghi, A Mivehchi
 
  Process Capability Studies: Indices and a Practical View
K Rezaie, MR Taghizadeh, B Ostadi, HR Taghavinejad, H Ghorbannejad