access deny [1420]
 
YEAR TITLE
2023 The role of using the database of materials and equipment in the implementation process of Building Information Modelling
A Bidhendi, M Azizi, E Eshtehardian
Amirkabir Journal of Civil Engineering 55 (4), 3-3
2023 Feasibility Study of Using Virtual Reality with Emphasis on Reducing the Cost of Finishing in Residential Projects (Case study: Construction projects in Districts 1 to 3 of Tehran)
M Shoraka, E Eshtehardian, V Faghihi, M Azizi
Journal of Structural and Construction Engineering 10 (1), 25-42
2022 An analysis on the reduction of accidents in the spaces of construction site by using the Internet of Things in Tehran
P Ashrafi, B Barmayehvar, E Eshtehardian
Journal of Spatial Analysis Environmental hazarts 9 (2), 161-178
2022 Using Bayesian networks for selecting risk-response strategies in construction projects
S Arabi, E Eshtehardian, I Shafiei
Journal of Construction Engineering and Management 148 (8), 04022067
2022 Feasibility Study of Using Virtual Reality with Emphasis on Reducing the Cost of Finishing in Residential Projects (Case study: Construction projects in Districts 1 to 3 of Tehran)
M Shoraka, E Eshtehardian, V Faghihi, M Azizi
Journal of Structural and Construction Engineering
2022 Identification and Analysis of the Relations between Risks and Stakeholders in the Implementation of E-government Projects
H Badavam, E Eshtehardian, H Hakamian, H Arbabi
Journal of Science and Technology Policy 15 (1), 37-53
2020 Dynamic modeling to reduce the cost of quality in construction projects
I Shafiei, E Eshtehardian, F Nasirzadeh, S Arabi
International Journal of Construction Management, 1-14
2020 Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hemmatian, ...
Journal of Structural and Construction Engineering 7 (Special Issue 3), 87-108
2019 Time-Cost-Quality trade off in Critical Chain Method with multi mode activities by Multi Objective Particle Swarm Optimization
MJ Taheri Amiri, F Haghighi, E Eshtehardian, O Abessi
Journal of Structural and Construction Engineering 6 (1), 134-154
2019 Framework for proactive change management: Assessing the risk of change in construction projects using fuzzy fault tree analysis
F Abad, E Eshtehardian, K Taghizade
Journal of Architectural Engineering 25 (2), 04019010
2019 Identification of Claim Paths Leading to Increased Costs in DBF Projects using System Dynamic Modeling Approach (A Case Study: Tehran Metro Projects
H Talkhabi, E Eshtehardian, A Mohaghar, MH Sobhiyah, JM Parchami
TUNNELING & UNDERGROUND SPACE ENGINEERING 7 (2), 87-104
2018 Multi-project time-cost optimization in critical chain with resource constraints
MJ Taheri Amiri, FR Haghighi, E Eshtehardian, O Abessi
KSCE Journal of Civil Engineering 22, 3738-3752
2018 A meta-heuristic algorithm for solving the time-cost optimization problem with multiple execution modes in construction projects.
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, ...
Asas Journal 20 (51), 16-29
2017 Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian
Journal of Engineering & Construction Management 2 (3), 46-55
2017 Cash flow forecasting with risk consideration using Bayesian Belief Networks (BBNS)
M Khanzadi, E Eshtehardian, M Mokhlespour Esfahani
Journal of Civil Engineering and Management 23 (8), 1045-1059
2017 Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)
MJ Taheri Amiri, FR Haghighi, E Eshtehardian, O Abessi
International Journal of Engineering 30 (5), 627-635
2017 Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)
MJ Taheri Amiri, FR Haghighi, E Eshtehardian, O Abessi
International Journal of Engineering 30 (5), 627-635
2017 Optimization of time and costs in critical chain method using genetic algorithm
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi
Journal of Engineering and Applied Sciences 12 (4), 871-876
2016 A game theory approach for optimum strategy of the owner and contractor in delayed projects
M Khanzadi, E Eshtehardian, A Chalekaee
Journal of Civil Engineering and Management 22 (8), 1066-1077
2016 A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects
E Eshtehardian, S Khodaverdi
Civil Engineering and Environmental Systems 33 (3), 227-246
2016 Developing Improvement Planning Phase in Project Management Maturity Models
E Eshtehardian, F Saeedi
Modern Applied Science 10 (9), 1-13
2016 Analytical survey of construction change systems: Gaps & opportunities
E Eshtehardian, S Khodaverdi
Procedia engineering 161, 944-949
2015 STATISTICAL ANALYSIS TO DETERMINE LEVEL OF RISK IN EXISTING UNCERTAINTY OF FREEWAY CONTRACTS BY THE BOT METHOD, CASE STUDY: SAVEH FREEWAY SALAFCHEGAN
E ESHTEHARDIAN, M KHANZADI, H FARSHAD
SHARIF: CIVIL ENINEERING 312 (32), 3-8
2014 USING ARTIFICIAL NEURAL NETWORK FOR FLOAT PRICING OF TEHRAN TRAFFIC TOLLS TO IMPROVE URBAN MANAGEMENT FOCUSED ON DECREASING AIR POLLUTION
E ESHTEHARDIAN, MALI FAEZIRAD
URBAN MANAGEMENT 13 (36), 145-154
2013 Multi-mode resource-constrained discrete time?cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
P Ghoddousi, E Eshtehardian, S Jooybanpour, A Javanmardi
Automation in construction 30, 216-227
2013 Using ANP and AHP for the supplier selection in the construction and civil engineering companies; Case study of Iranian company
E Eshtehardian, P Ghodousi, A Bejanpour
KSCE Journal of Civil Engineering 17, 262-270
2011 Stochastic time?cost optimization using non-dominated archiving ant colony approach
E Kalhor, M Khanzadi, E Eshtehardian, A Afshar
Automation in Construction 20 (8), 1193-1203
2009 Fuzzy-based MOGA approach to stochastic time?cost trade-off problem
E Eshtehardian, A Afshar, R Abbasnia
Automation in construction 18 (5), 692-701
2008 Time-cost trade-off problem in construction project management, based on fuzzy logic
R Abbasnia, A Afshar, E Eshtehardian
Journal of Applied Sciences 8 (22), 4159-4165
2008 Optimization of uncertain construction time-cost trade-off problem
E Eshtehardian, R Abbasnia, A Afshar
First International Conference on Construction in Developing Countries ?
2008 An improved linear programming model for one-dimensional cutting stock problem
A Afshar, H Amiri, E Eshtehardian
1st Intl. Conf. on Construction in Developing Countries (ICCIDE-1), Pakistan ?
2008 Uncertain scheduling based on accepted risk level and optimism of a project manager
E Eshtehardian, A Afshar, R Abbasnia
Proceedings First International Conference on Construction in Developing ?
2008 Time?cost optimization: using GA and fuzzy sets theory for uncertainties in cost
E Eshtehardian, A Afshar, R Abbasnia
Construction Management and Economics 26 (7), 679-691
2006 NEW METHOD IN ASSESSMENT OF CONTRACTOR PREQUALIFICATION
R ABASNIA, A AFSHAR, E ESHTEHARDIAN
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT ?
2003 Evaluation of pre-qualification indexes and superior contractor selection in tenders
E Eshtehardian
M. Sc. Thesis, Iran University of Science and Industry.(In Persian)
1995 Stochastic time-cost optimization model incorporating fuzzy sets theory and non replaceable front.
R Abbasnia, A Afshar, E Eshtehardian, P De, EJ Dunne, CE Wells, K Deb, ...
Journal of Applied Sciences 8 (22), 225-238
  An analytical survey of construction changes: gaps and opportunities
E Eshtehardian, S Khodaverdi