Mahmood Abdollahi
Professor
Speciality: Flotation, Hydrometallurgy
  • BS/BA:
  • MS: Mining Engineering(exploitation)
  • PhD: Mineral processing
  • Phone: 82883393
  • Fax: 82884324
  • Email: minmabd@modares.ac.ir
  • Address: School of Engineering, Tarbiat Modares University
  • Resume Download
 
XI.RESEARCH STUDENTS SUPERVISED:
1.      Ganji, S.M., An investigaion on the recovery of Cobalt from Tidar-Oghlid Mine, in Fars Province using different processes, 2000.
2.      Behnia, M.; The investigation on the recovery of zinc oxidized ores of Haft- Emarat mine using flotation, 2001.
3.      Kafiri, Gh.; The Recovery of gold from Sarcheshmeh copper Anode Slimes, 2001
4.      Ghobadi, B.; The recovery of cobalt from electrolytic zinc filter cake produced in Isfahan zine smelting plant, 2001.
5.      Shahsavari, Sh.; The leaching of the electrolytic zinc filter cake to extract their nickel and cadmium, 2001.
6.      Khosravi, M.; An Investigation on leaching of preconcentration cobalt ores from Oghlid tidar mine in Fars Province, 2002.
7.      Delavarian, M.; The recovery of tellurium from Sarcheshmeh copper anode slimes, 2002.
8.      Ghasemi, S.; Iron removal from Robatkhan Tabas kaolin using hydrometallurgical method, 2002.
9.      Rami, Kh; Desulphurization and Ash removing from  Tabas coal mine, 2003.
10. Pagard, H.; Determination of kind and Amount of Reagents in column Flotation of Hematite in Chadormaloo mine, 2004.
11. Rahimi, M.; The phase identification of dolomite ore from iron removal point of view, 2004.
12. Vafaeifard, M.; The recovery of lead from the leaching residue of zinc oxidised ores, 2004.
13. Zamani KR. "Darreh Zanjir mine silicate–carbonate minerals characterization from leaching point of view", 2004.
14. Zakeri M. "Development of gold separation by gravity and magnetic units on kohzar mineral processing plant – Damgan", 2004.
15. Hashemzadeh, M.; Decopperization of Sarcheshmeh copper anode slimes, 2004.
16. Naderi, H.;  An investigation on beneficiation of Lakhshak antimony ore,2005.
17. Abbaszadeh, M.; Improvements in the Gold Cementation Process at Agh ِDarreh,Takab. A Special Case Study, 2005.
18. Aram, R.; Recovery of coal from flotation tailings of Alborze Sharghi coal cleaning plant,2005.
19. Serajian, S.; Determining the effective parameters on the recovery of molybdenite from Songoon copper concentrate, 2005.
20. Samiee, A.; An investigation on cyanide adsorption by activated carbon, zeolite and talc from wastewater of Aghdareh Takab gold processing plant, 2006.
21. Keikhaei, M.R.; Optimization of selective extraction conditions of Gallium from Bayer solution, 2006.
22. Javanshir, S.; Recovery of gold from leach solution of Sarcheshmeh copper anode slimes, 2006.
23. Zare Tavakoli,H.; Possibility of uranium bioleaching of Saghand mine, 2007.
24. Karami, M.; Investigation on indium recovery
from zinc sulfide concentrate, 2007.
25. Ghaffari A. '' Optimization of gold cyanide leaching process in order to increasing Ag and Hg recovery in Pouyazarkan Aghdareh plant '', 2007.
26. Taheri, B.; Determining A Suitable Alternative for Sodium Sulfide to be Used in Molybdenum Enrichment Plant of Sarcheshmeh Copper Complex, 2008.
27. Samadzadeh Yazdi, M.R.; An Investigation on Yb Extraction from Leach Solution of Central Iran Metasomatic Ores, 2009.
28. Dashti M. '' Investigation of leaching method of zinc recovery from dust furnace'', 2009.
29. Parian A., ''Silver recovery from nitric leach solution of copper anodic slimes '', 20xx.
 
XII.RESEARCH STUDENTS (M.Sc) CO-SUPERVISED
1.      Sadeghi, M.; Design and calculation of Razi coal mine ventilation network, 2000.
  1. Moradi S. "Investigation on zinc recovery from (0–2) mm tailing of Anguran flotation plant using Hydrometallurgical methods", 2000.
  2. Valivand A. "Investigation on effective parameters on uranium column leaching using in heap leaching design on East Azarbayjan uranium mine (Dechan)", 2000.
  3. Akbarzadeh, S.M.; Economic investigation of processing plant of Kooshk lead and zinc, 2001.
  4. Azizafshari, F.; Reduction of phosphorous from final iron concentrate of Chadormaloo mine, 2002.
  5. Javadian A. "Effective parameter on optimization of copper leaching from copper oxide ore – Darreh Zereshk copper mine", 2003.
  6. Taimouri, P.; Cyanide removal methods from wastewater of Muteh gold plant, 2004.
  7. Asadi A. "Investigation on effective parameter on molibdenite column flotation from Sarcheshmeh mine", 2004
  8. Nasrabadi M. "Investigation on Titanium processing methods", 2004.
  9. Fathi M. ''Major impurities removal from Masod abad Talc ore '', 2007.
  10. Faramarzi, M.; Iron removal from Chalchoogh silica mine ore by leaching, 2007.
  11. Khormali R. '' The iron removal from Jajarm bauxite ore by acid leaching in order to bauxite enrichment '', 2008.
  12. Tavakoli M. ''Copper Recovery From Dilute Solution By New Dissolved Nitrogen Predispersed Solvent Extraction (DNPDSE) Method '', 2008.
  13. Mehrpoya H. ''Extraction of indium from zinc sulphide concentrate by hydrometallurgical method '', 2008.
  14. Ashtari P. ''Nickel recovery from cake filter of zinc leaching plant by solvent extraction '', 2008.
  15. Hadipanah M. ''An investigation of parameters effecting the performance of spirals at Zarand Coal Washing Plant '', 2008..
 
XIII. RESEARCH STUDENTS (Ph.D) CO-SUPERVISED
1.    Jorjani, Es.; The desulfurization of Tabas coal mine (C1 seam) with chemical or biological methods based on characterization studies, 2003.
2.    Moghaddam, J.; Hydrometallurgical production of zinc oxide nano powder from Silicate- oxidized minerals, 2007.