A wide range of projects has been so far finished or presently underway by IPSERC, sponsored by various Iranian electric companies such as Iran Grid Management Company (IMGC), Tavanir and regional electric utilities.

    Some selected projects already finished are:
  • Long-term transmission planning of Iranian power grid for 2009 and 2019
  • Extensive long-term planning studies for Fars electric utility (2004- 2009)
  • Extensive long-term planning studies for  Yazd electric utility (2004- 2009)
  • Extensive reactive power planning for Zanjan electric utility
  • Stability analysis of Hormozgan electric utility
  • Extensive reactive power planning of Iranian power grid
  • Phase shifter allocation and sizing for Fars electric utility
  • Extensive reactive power planning for Fars and Khorasan electric utilities
  • Design of Iranian grid data base
  • Stability analysis of Bakhtar electric utility
  • GIS for Fars electric utility
  • d constructing its database...
  • Deriving optimal and economical index for assessment of home electrical appliance
  • Studying the effect of DST in the energy consumption pattern of Iran in the first half of 2006
  • Demand side management strategies for the next twenty years
  • Operational planning standards
  • Power system planning data base and base case generator
  • Market grid code
  • Rey power plant capacity increase using phase shifters
  • Ultra High Voltage (UHV) for the Iranian power grid
  • Extensive long- term planning studies for Mazandaran electric utility (2009-2013)
  • Extensive long- term planning studies for Tehran electric utility (2009-2013)
  • Extensive long- term planning studies for Fars electric utility (2009-2013)
  • South- eastern transmission system adequacy improvement
  • Short circuit level reduction strategies for three main transmission substations


 